Open Access
Issue |
MATEC Web Conf.
Volume 251, 2018
VI International Scientific Conference “Integration, Partnership and Innovation in Construction Science and Education” (IPICSE-2018)
|
|
---|---|---|
Article Number | 05012 | |
Number of page(s) | 8 | |
Section | Management in Construction | |
DOI | https://doi.org/10.1051/matecconf/201825105012 | |
Published online | 14 December 2018 |
- Sborshchikov S. B. Logistika reguliruyushchikh vozdeystviy v investitsionno-stroitel’noy sfere (teoriya, metodologiya, praktika): diss. dok. ekonom. nauk [Logistics of the regulatory impacts in an investment-constriction field (theory, methodology, practice): thesis of doctor of economic sciences], text; Rossiyskaya ekonomicheskaya akademiya im. G. V. Plekhanova [Pleckhanov Russian university of Economics]. – M., (2012). – p. 305 [Google Scholar]
- Khripko T.V. Osobennosti realizatsii protsedur otsenki i otbora predlozheniy kontragentov v usloviyakh inzhiniringovoy skhemy upravleniya stroitel’stvom [Features of the implementation of evaluation and selection of counterparty proposals procedures in the conditions of the engineering construction management scheme]; BST: Byulleten’ stroitel’noy tekhniki [BST — Bulletin of Construction Equipment]. (2017). No. 12 (1000). pP. 40–41. [Google Scholar]
- Leybman D.M. Parametricheskaya model’ funktsionirovaniya sistemy strategicheskogo kontrollinga stroitel’stva unikal’nykh i tekhnicheski slozhnykh ob’yektov [Parametric model of the functioning of strategic controlling of unique and sophisticated facility construction]; Problemy sotsial’no-ekonomicheskogo razvitiya Sibiri [Issues of Social Economic Development of Siberia]. (2017). No. 4 (30). pP. 72–77. [Google Scholar]
- Shinkareva G.N. and others. Otsenka effektivnosti upravleniya realizatsiyey stroitel’nogo proyekta v usloviyakh vozdeystviya sluchaynykh faktorov [Evaluation of the efficiency of the construction project implementation management under the influence of random factors];Vestnik MGSU[Proceedings of the Moscow State University of Civil Engineering]. (2017). v. 12. No. 11 (110). pP. 1240–1247. [Google Scholar]
- Leybman D.M. Svyazi v sisteme strategicheskogo kontrollinga kak osnova obespecheniya effektivnogo kontura upravleniya investitsionno-stroitel’noy deyatel’nost’yu na korporativnom urovne [Connections in the strategic controlling system as the basis for ensuring an effective control loop of the investment-construction activity at the corporate level]; Vestnik Belgorodskogo gosudarstvennogo tekhnologicheskogo universiteta im. V.G. Shukhova [Proceedings of the Belgorod State Technological University named after V.G.Shukhov]. (2018). No. 1. pP. 111–116. [Google Scholar]
- Leybman D.M. Strategicheskiy kontrolling instrument obespecheniya ustoychivogo razvitiya investitsionno-stroitel’noy deyatel’nosti [Strategic controlling is an instrument of ensuring the sustainability of the investment-construction field]; Vestnik Belgorodskogo gosudarstvennogo tekhnologicheskogo universiteta im. V.G. Shukhova [Proceedings of the Belgorod State Technological University named after V.G.Shukhov]. (2018).No. 2. pP. 88–93ю [Google Scholar]
- Lazareva N.V. and others. Ustoychivoye razvitiye investitsionno-stroitel’noy deyatel’nosti v energeticheskom sektore [Sustainability of the investment-construction field in the energy industry]; Vestnik grazhdanskikh inzhenerov [Bulletin of civil engineers]. (2018). No. 2 (67). pP. 269–275. [Google Scholar]
- Zharov YA.V. Uchet organizatsionnykh aspektov pri planirovanii stroitel’nogo proizvodstva v energetike [Consideration of the organizational aspects in planning of energy sector construction] Zhurnal PGS [Industrial and civil engineering]. (2013). No. 5. pP. 69–71. [Google Scholar]
- Aleksanin A.V. Perspektivnyye napravleniya razvitiya organizatsii stroitel’stva [Prospective directions of the organization of construction]; Nauchnoye obozreniye [Scientific Review]. – (2015). – No. 10-1. pP. 378–381. [Google Scholar]
- Lyapin A.V., Lyapin V.YU. Sovremennyy podkhod k organizatsii smetnoy deyatel’no-sti v stroitel’stve [Modern approach to the estimated activity management in construction]. Text. Nauchnoye obozreniye [Scientific Review]. – (2016). – No. 8. pP. 251–255. [Google Scholar]
- Zhuravlev P.A. K voprosu ispol’zovaniya resursno-tekhnologicheskogo modelirovaniya pri formirovanii investitsionnykh program [To the issue of using resource-technological models in the formation of investment programs]. Text. Vestnik Belgorodskogo gosudarstvennogo tekhnologicheskogo universiteta im. V.G. Shukhova (Proceedings of the Belgorod State Technological University named after V.G.Shukhov) – (2017). – No. 7. – pP. 198–201. [Google Scholar]
- Lazareva N.V., Bakhus Ye.Ye. K voprosu effektivnosti obespecheniya kachestva stroitel’noy produktsii [To the issue of quality assurance efficiency of construction]. Text. // Nauchno-teoreticheskiy zhurnal Vestnik BGTU im. V.G. Shukhova [Proceedings of the Belgorod State Technological University named after V.G.Shukhov]. No. 12, (2017), pP. 220–225. [Google Scholar]
- Lazareva N.V. Stoimostnoy inzhiniring kak osnova integratsii protsessov planirovaniya, finansirovaniya i tsenoobrazovaniya v investitsionno-stroitel’noy deyatel’nosti [Cost engineering as the base of integration of the planning, financing and pricing processes in the investment-construction activity]. Text. Vestnik MGSU [Proceedings of the Moscow State University of Civil Engineering]. – (2015). – No. 11. – pP. 178–185. [Google Scholar]
- Zhuravlev P.A. Tsena stroitel’stva i etapy yeye formirovaniya [The construction value and the stages of its formation]. Text. Vestnik Irkutskogo gosudarstvennogo tekhnicheskogo universiteta [Proceedings of the Irkutsk National Research Technical University]. (2015). – No. 9 (104). – pP. 174–178. [Google Scholar]
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.