Open Access
Issue |
MATEC Web Conf.
Volume 251, 2018
VI International Scientific Conference “Integration, Partnership and Innovation in Construction Science and Education” (IPICSE-2018)
|
|
---|---|---|
Article Number | 03007 | |
Number of page(s) | 7 | |
Section | Engineering and Smart Systems in Construction | |
DOI | https://doi.org/10.1051/matecconf/201825103007 | |
Published online | 14 December 2018 |
- J. Meriam, L. Kraige. Engineering Mechanics, I – Statics, II – Dynamics, 6th Ed, John Wiley (2008) [Google Scholar]
- F. Beer, E. R. Johnston. Vector Mechanics for Engineers, I Statics, II – Dynamics, 9th Ed, Tata McGraw Hill (2011) [Google Scholar]
- I. Shames. Engineering Mechanics: Statics and dynamics, 4th Ed, PHI (2002) [Google Scholar]
- R. Hibbler. Engineering Mechanics: Principles of Statics and Dynamics, Pearson Press (2006) [Google Scholar]
- M. Zyczkowski. Optimal structural design under creep conditions (2), Appl. Mech. Reviews, 49, 9, 433–446 (1996) [Google Scholar]
- D. Krajcinovic. Continuum Damage Mechanics: when and how?, Int. J. Damage Mechanics, 4, July, 217-229 1995) [Google Scholar]
- F.P. Dunne. Hayhurst, Efficient cycle jumping techniques for the modeling of materials and structures under cyclic mechanical and thermal loadings, Eur. J. Mech., A/Solids, 13, 5, 639–660 (1994) [Google Scholar]
- J. Altenbach, H. Altenbach, K. Naumenko. Lebendauerabschiitzung diinnwandrige FI1i.chentragwerke auf der Grundlage phenomenologischer Materialmodelle fur Krichen und Schiidigung,. Techn. Mechanik, 12, 4, 353–364 (1997) [Google Scholar]
- E. Kudryavtsev. Computer modeling, designing and calculation of elements of machines and mechanisms. Moscow: ASV (2018) [Google Scholar]
- E. Kudryavtsev, M. Stepanov. Building Crane. Part 1. Tower cranes. Base of the theo-ry, constractions and calculations. Мoscow: АSV (2016) [Google Scholar]
- E. Kudryavtsev. Stroitelnye mashiny I oborudovanie (s primerami raschetov, vkluchay I na komputere) [Building machinery and equipment (with examples of calculations, in-cluding and on the computer)]. Moscow: ASV, 2012. 328 p. [Google Scholar]
- E. Kudryavtsev, M. Stepanov. Performance of final qualifying work on the computer. Moscow: BASTET (2012) [Google Scholar]
- L. Ushakov, A. Panichkin. D. Grebenchenko, M. Zhukov. Analysis of ways and tools of carrying out lifting and transport operations for bulky goods with a shifted center of gravity. Mir transporta i tekhnologicheskikh mashin. No. 1(44). 50–54 (2014) [Google Scholar]
- A. Volkov, V. Roytman, L. Shilova. Model of stability of life support systems in emer-gency situations. International Journal of Applied Engineering Research. 11. No. 3. 1666–1669 (2016) [Google Scholar]
- A. Volkov, D. Lysenko, A. Doroshenko, A. Sedov, P. Chelyshkov. Computer modeling in evaluating standard projects of school buildings. International Journal of Applied Engineering Research. 10. No 22. Pp. 43269–43272 (2015) [Google Scholar]
- A. Volkov, P. Chelyshkov, D. Lysenko. Information management in the application of bim in construction. Stages of construction. // Procedia Engineering. 153. 833–837 (2016) [Google Scholar]
- E. Kudryavtsev. Computer-aided design systems of the machinery and equipment. М: АSV (2013) [Google Scholar]
- E. Kudryavtsev. Base of the automation designing. Moscow:.Academy (2011) [Google Scholar]
- E. Kudryavtsev. Full manual of the Russian version. Мoscow: DМК Press (2005) [Google Scholar]
- E. Kudryavtsev. Mathcad 2000. The symbolical and numerical decision of various problems. Мoscow: DМК Press (2001) [Google Scholar]
- E. Kudryavtsev. Mathcad 8. The symbolical and numerical decision of various prob-lems. Мoscow: DМК Press (2000) [Google Scholar]
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.