Open Access
Issue |
MATEC Web Conf.
Volume 248, 2018
4th Engineering Science and Technology International Conference (ESTIC 2018)
|
|
---|---|---|
Article Number | 03013 | |
Number of page(s) | 5 | |
Section | Industrial Engineering | |
DOI | https://doi.org/10.1051/matecconf/201824803013 | |
Published online | 10 December 2018 |
- M. Christou, M. Konstantinidou Safety of offshore oil and gas operations. J. RC Eur C. Italy, (2012). [Google Scholar]
- B. Akatova, E. R. Curran.,. F Assmts Sys RM. J Modelling Mngmnt, 8 (3) (2013). [Google Scholar]
- A.S. Darmawan, W.A. Siswanto, T. Sujitno, R J of App Sc, E & T 5(4) (2013). [Google Scholar]
- A.S. Darmawan, A.D. Anggono, A. hamid, D design Opt. MATEC 154, 01105 (2018) [Google Scholar]
- T. Shimizu, Y. W. Park, P. Hong, P mngrs f R M case f Japan. An Int J, 19(4/5), (2012) [Google Scholar]
- A.Hamid, I. Baba, W. Sani, Prp for R M implmnt phase, MATEC 97 01067 (2017) [Google Scholar]
- A.Hamid, I. Baba, W. Sani, RM frameW in oil f Dev. Projt. IJASEIT, 7 (2), (2017) [Google Scholar]
- F. Barahim, Hazard Ident, (Hirarc ) in a Corrugated Box Manufacturer. (2010). [Google Scholar]
- T. Bjerga, T. Aven,. Adaptive risk mngmnt using new risk persp. 134, 75–82 (2015). [Google Scholar]
- API 6A – Spec. for Wellhead and Christmas Tree Equipment, 552 (3), 443 (2008) [Google Scholar]
- N. Chileshe, B.Y. Fianko,. An Evl of R F impact. J Eng, Dsgn and Tech, 10(3), (2012) [Google Scholar]
- P.N. Ranong, W. Phuenngam, Critical S F F Eff. R M Procdr 1–76 (2009) [Google Scholar]
- D. Schoenfeld Organisational Risk Culture, (Thesis Ph.D). (2013). [Google Scholar]
- S. Ameziane A resilience engineering app.r to safety excellence (Thesis Ph.D), (2016). [Google Scholar]
- R.Olsson,. RM in a multi‐prj envirn. Int J of Q & R Mngmnt, 25(1), (2008) [Google Scholar]
- R. Olsson, Mangng Proj Uncertainty (Thesis Ph.D open access) (2006). [Google Scholar]
- O. Otobo, RM sys to guide B const. proj (Thesis Ph.D) (2016). [Google Scholar]
- H. Zhang, M. Yongbo,. Prodt Dev RM in Prod Dev Proc. Int B & Mngmnt, 3(1) (2011) [Google Scholar]
- Project Managmnt Institute. Project Management Body of Knowledge PMIBOK 2013 [Google Scholar]
- G.D. Garson,. Testing Statistical Assumptions. Blue Book Series, 1–52 (2012) [Google Scholar]
- M. Tavakol, R. Dennick, Making S of Cronbach’s alpha. Int J of Med. Edu, 2, (2011) [Google Scholar]
- G. Groth-Marnat, Handbook of Psycholgical Assessment (4th Edition). (2003). [Google Scholar]
- F. Goerlandt, N. Khakzad, G. Reniers,. V & valid of sfty. Safety Science, 99, (2017) [Google Scholar]
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.