Open Access
Issue
MATEC Web Conf.
Volume 147, 2018
The Third International Conference on Sustainable Infrastructure and Built Environment (SIBE 2017)
Article Number 06003
Number of page(s) 12
Section Construction Management
DOI https://doi.org/10.1051/matecconf/201814706003
Published online 22 January 2018
  1. Aishah Momoh, Rajkumar Roy and Essam Shehab. A Work Breakdown Structure for Implementing and Costing ERP Project. (Communications of the IBIMA,2008) 94-103
  2. Al-Anbari.S, Khalina, A. Safety and Health Risk. Ass.at.Oman. Build. Const. Pro. Oman. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 Volume: 02. 571-578 (2013).
  3. Alex, Albert. Emerging Strategies for Construction Safety & Health Hazard Recognition. Journal of Safety, Health & Environmental Research 152-160, (2014).
  4. Hans, Robert. Wor.Bre.Stru: A Tool for Soft Pro. Sco. Ver. International Journal of Software Engineering & Applications (IJSEA), Vol.4, No.4. 19-25, (2013).
  5. Kai Chen Goh 1,a, Hui Hwang. Accidents Preventive Practice for High-Rise Construction. (EDP Sciences, MATEC Conference, 2016). 04004-p.1-04004-p.6
  6. Kamar, Mohd-N.S. Lop, N. Mat. Contractor’s Awareness on Occupational Safety and Health(OSH) Management Systems in Construction Industry, (EDP Science Confrences, 2014) 01019-p.1-01019-p.6,
  7. Mhetre, K; Konnur, B.A; B, Amarsinh. Risk Man.t in. Con. Ind. International Journal of Engineering Research Volume No.5. 153-155, (2016)
  8. PMI, Practice Standard for Work Breakdown Structures Second Edition,Pennsylvania: Project Management Institute, (2006).
  9. Satish Kumar. Current State of Construction Safety Planning Practice. Proc. of Int. Conf. on (Advances in Civil Engineering, 2011), 47-50
  10. Shlomo Globerson. Imp. Of. Var. WBS on Pro. Concept. (International Journal of Project Management, 1994), Vol. 12. 165-171 [CrossRef]
  11. Su,Lei. WBS-based Risk Identification for the Whole Process of Real Estate Project and Countermeasure. (National Conference on Information Technology and Computer Science, 2012).780-783
  12. Van Tonder, J.C. and Bekker, M.C. (2001). Analysis of A Methodology to Obtain a Work Breakdown Structure Built Up From Interdependent Key Project Deliverable Packages. (African Rhythm Project Management Conference, 2002),ISBN Number: 0-620-28853-1
  13. Zid Chaher, Ali Raza Soomro. Fac. Risk.Man in Cons. Pro by using Hie. RBS. (International Journal of Scientific and Research Publications, 2016).Volume 6, Issue 7. 703-709

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.