Open Access
Issue
MATEC Web Conf.
Volume 117, 2017
RSP 2017 – XXVI R-S-P Seminar 2017 Theoretical Foundation of Civil Engineering
Article Number 00130
Number of page(s) 8
DOI https://doi.org/10.1051/matecconf/201711700130
Published online 24 July 2017
  1. Said M. Easa Resource Leveling in Construction by Optimization // ASCE. Journal of Con-struction Engineering and Management. (1989) [Google Scholar]
  2. S. Farzad Moosavi and Osama Mosehli Review of Detailed Schedules in Building Construction // ASCE. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction. (2014) [Google Scholar]
  3. Yuanjie Tang, Rengkui Liu and Quanxin Sun Two-Stage Scheduling Model for Resource Leveling of Linear Projects // ASCE. Journal of Construction Engineering and Management. (2014) [Google Scholar]
  4. Min-Yuan Cheng, Doddy Prayogo, Duc-Hoc Tran Optimizing Multiple-Resources Leveling in Multiple Projects Using Discrete Symbiotic Organisms Search // ASCE. Journal of Computing in Civil Engineering. (2016) [Google Scholar]
  5. Selen Mubarak Construction Project Scheduling and Control. Canada: John Wiley & Sons, (2010) [CrossRef] [Google Scholar]
  6. Alcaraz, J., Maroto, C., Ruiz, R. Solving the multi-mode resource-constrained project scheduling problem with genetic algorithms // Journal of Operational Research Society, 54, 614–626 (2003) [CrossRef] [Google Scholar]
  7. Bouleimen K. and Lecocq H. A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version // European Journal of Operational Research, 149, 268–281 (2003) [CrossRef] [Google Scholar]
  8. Hsiang-Hsi Huang, Chian-Ying Huang, Yu-Tsung Chen // Proceedings of the 4th International Conference on Engineering, Project, and Production Management (EPPM 2013) [Google Scholar]
  9. Hong-Hai Tran and Nhat-Duc Hoang A Novel Resource-Leveling Approach for Construction Project Based on Differential Evolution // Journal of Construction Engineering (2014) [Google Scholar]
  10. Ying Xiong, Ya Ping Kuang Ant colony optimization algorithm for resource leveling problem of construction project // The CRIOCM 2006 International Symposium on “Advancement of Construction Management and Real Estate” –(2006) [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.