Issue |
MATEC Web Conf.
Volume 117, 2017
RSP 2017 – XXVI R-S-P Seminar 2017 Theoretical Foundation of Civil Engineering
|
|
---|---|---|
Article Number | 00130 | |
Number of page(s) | 8 | |
DOI | https://doi.org/10.1051/matecconf/201711700130 | |
Published online | 24 July 2017 |
Optimization of the annual construction program solutions
Moscow State University of Civil Engineering, 129337, 26, Yaroslavskoye Shosse, Moscow, Russia
* Corresponding author: aljurgaitis@gmail.com
The article considers potentially possible optimization solutions in scheduling while forming the annual production programs of the construction complex organizations. The optimization instrument is represented as a two-component system. As a fundamentally new approach in the first block of the annual program solutions, the authors propose to use a scientifically grounded methodology for determining the scope of work permissible for the transfer to a subcontractor without risk of General Contractor’s management control losing over the construction site. For this purpose, a special indicator is introduced that characterizes the activity of the general construction organization - the coefficient of construction production management. In the second block, the principal methods for the formation of calendar plans for the fulfillment of the critical work effort by the leading stream are proposed, depending on the intensity characteristic.
Key words: Annual production program of the construction company / scheduling / annual (current) planning / optimization solutions / optimization / the coefficient of construction production management / intensity of work performance / human resource / labor
© The Authors, published by EDP Sciences, 2017
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.