Open Access
Issue
MATEC Web Conf.
Volume 106, 2017
International Science Conference SPbWOSCE-2016 “SMART City”
Article Number 08001
Number of page(s) 8
Section 8 Organization and Planning of Construction Works and Municipal Facilities
DOI https://doi.org/10.1051/matecconf/201710608001
Published online 23 May 2017
  1. P.L. Bannermann. PMI Research Conference : Defining the future of project management, Warsaw, Poland, (2008) [Google Scholar]
  2. M. Freeman and P. Beale. Project Management Journal, 23 1, 8–17, (1992) [Google Scholar]
  3. F. Ling, S. Low, S. Wang and H. Lim. International Journal of Project Ma D nagement, 27, 1, 59–71 (2009) [Google Scholar]
  4. A.J. Shenhar, O. Dvir, O. Levy and A.C Maltz. Long Range Planning, 34, 4, 699–725 (1992) [CrossRef] [Google Scholar]
  5. Lauras M., Marques G. and Gourc D. Decision Support Systems, 48, 342–353 (2001) [CrossRef] [Google Scholar]
  6. A. Neely, M. Gregory and K. Platts. International Journal of Operations and Production Management, 25 12, 1228–1263 (2005) [Google Scholar]
  7. Q. Cao and J.J. Hoffman. International Journal of Project Management, 29, 155–164 (2010) [CrossRef] [Google Scholar]
  8. R.K. Yin. Case Study Research, Design and Methods, (Sage Publications, Thousand Oaks, California, 1994) [Google Scholar]
  9. M Hammer. Sloan Management Review, 48, 3, 19–28, (2007) [Google Scholar]
  10. Project Management Institute. Organizational Project Management Maturity Model (OPM3), Project Management Institute, Inc., (2003) [Google Scholar]
  11. R.H Hayes. and S.C. Wheelwright, Restoring our Competitive Edge, (John Wiley, 1984) [Google Scholar]
  12. D. Medori and D Steeple. International Journal of Operations and Production Management, 20, 5, 225–248 (2000) [CrossRef] [Google Scholar]
  13. J. Farris, R.L. Groesbeck, E.M. Van Aken and G. Letens. IEEE Transactions on Engineering Management, 53, 3, 471–482 (2006) [CrossRef] [Google Scholar]
  14. A.P.C. Chan and A.P.L Chan. (2004) Benchmarking: An International Journal, 11, 2, 203–221 (2002). [CrossRef] [Google Scholar]
  15. A.P.C. Chan, D. Scottand. Journal of Management in Engineering, 18, 3, 120–128 (2004) [CrossRef] [Google Scholar]
  16. M.C. Paulk, C.V Weber, B Curtis and M.B. Chrissis. The Capability Maturity Model: Guidelines for Improving the Software Process, (Addison-Wesley, Boston, 2006) [Google Scholar]
  17. Slack N., Chambers S., Johnston R. and Betts A. Operations and Process Management, (Pearson Education Limited, 1995) [Google Scholar]
  18. T. Pyzdek, The Six Sigma Project Planner, (McGraw-Hill, 2006) [Google Scholar]
  19. B. Titarenko. International Journal of Project management. 15, 1, 11–14, 1997). [CrossRef] [Google Scholar]
  20. B. Titarenko, S. Titov, R. Titarenko. AMM. 638-640, 2338–2341, (2014). [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.