Open Access
Issue
MATEC Web Conf.
Volume 66, 2016
The 4th International Building Control Conference 2016 (IBCC 2016)
Article Number 00059
Number of page(s) 8
DOI https://doi.org/10.1051/matecconf/20166600059
Published online 13 July 2016
  1. Bryce, J. M. (2008). Developing Sustainable Transportation Infrastructure. Retrieved from www.wiseintern.org/journal/2008/JamesBryceFinal [Google Scholar]
  2. Begum, R.A., Siwar, C., Pereira, J.J. & Jaafar, A.H. (2007). A benefit-cost analysis on the economic feasibility of construction waste minimization: The case of Malaysia. Resources, Conservation and Recycling, 48(1), 86–98. [Google Scholar]
  3. Wokekoro, E. (2007, 28-30 August). Solid waste management in the construction industry (a case study of Port Harcourt). Paper presented at the International Conference “Waste Management, Environment Geotechnology and Global Sustainable Development, Ljubljana, Slovenia. [Google Scholar]
  4. Global Environment Centre (GEC). (2012). Solid Waste in Malaysia. Retrieved 14/07/2015, from www.gecnet.info/index.cfm?&menuid=83 [Google Scholar]
  5. Papargyropoulou, E., Preece, C., Padfield, R. & Abdullah, A.A. (2011). Sustainable Construction Waste Management in Malaysia: A Contractor’s Perspective. Management and Innovation for a Sustainable Built Environment. [Google Scholar]
  6. Begum, R.A., Siwar, C., Pereira, J.J. & Jaafar, A.H. (2009). Attitude and behavioral factors in waste management in the construction industry of Malaysia. Resource, Conservation and Recycling., 53, 321–328. [CrossRef] [Google Scholar]
  7. Formoso, C. T., Soibelman, L., Cesare, C. D., & Isatto, E. L. (2002). Material waste in building industry: Main causes and prevention. Journal of contruction engineering management, 128, 316–325. [Google Scholar]
  8. Tchobanoglous, G., Theisin, H. & Vigil, S.A. (1993). Integrated Solid Waste Management: Engineering Principles and Management Issues. Singapore: McGRAW-HILL. [Google Scholar]
  9. Pitchel, J. (2005). Waste Management Practices: municipal, hazardous, and industrial. United State: Taylor & Francis Group. [Google Scholar]
  10. Bai, R. & Sutanto, M. (2002). The practice and challenges of solid waste management in Singapore. Journal of waste management, 22, 557–567. [CrossRef] [Google Scholar]
  11. Official national solid waste management (ONSW). (2012). Retrieved 05/08/2015, from http://www.kpkt.gov.my/jpspn_en/main.php [Google Scholar]
  12. Environment Strategies for Cities. (2000). Sources and Types of Solid Waste. Retrieved 11/06/2015, from web.mit.edu/urbanupgrading/urbanEnvionment/sectors/solidw-waste-sorces.html [Google Scholar]
  13. Basri, H., & Ahmad Basri, N.E. (2008). UrusSisa: An Intelligent System for Integrated Solid Waste Managament. Journal of Sustainable Development, 1(2), 39–46. [Google Scholar]
  14. United Nations Development Programme (UNDP) (2008M). Malaysia developing a solid waste management model for Penang. Retrieved 28/12/2015, from http://www.undp.org.my/Uploads/SWM-2008_final.pdf [Google Scholar]
  15. California Stormwater Quality Association (CASQA). (2014). Retrieved 15/06/2015, from http://www.cabmphandbooks.com/Documents/Construction/WM-05.pdf [Google Scholar]
  16. Poon, C.S., Ann, T.W.Y. & Jaillon, L. (2004). Reducing Building waste at construction sites in Hong Kong. Construction Management & Economics, 22(5), 461–470. [Google Scholar]
  17. Faniran, O. O., & Caban, G. (1998). Minimizing waste on Construction project sites. Engineering, Construction and Architectural management, 5 Iss: 2, 182–188. [Google Scholar]
  18. Macozoma, D.S. (2002). International report – construction site waste management and minimisation. International Council for Research and Innovation in Building and Construction (CIB). Report No. BOU/C361. [Google Scholar]
  19. Bruce, M. & Smitchers, M. (1998). Implementing a waste management plan during the construction phase of project: a case study. Construction Management & Economics, 16(1), 71–78. [CrossRef] [Google Scholar]
  20. Lim, M.C.H. & Ling, F.Y.Y. (2002). Implementation solid waste management plan for construction projects in Singapore. Architectural Science Review 45: Taylor & Francis Group. [Google Scholar]
  21. Al-Hammad, A. M. & Assaf, S. (1996) Assessment of work performance of maintenance contractors in Saudi Arabia. Journal of management in engineering, 12(1996), 44–49. [CrossRef] [Google Scholar]
  22. Lachimpadi, S. K., Pereira, J. J., Taha, M. R. & Mokhtar, M. (2012). Construction waste minimisation comparing conventional and precast construction (mixed system and IBS) methods in high-rise buildings: a Malaysia case study. Resources, Conservation and Recycling, 63 (2012), 96–103. [CrossRef] [Google Scholar]
  23. Technologiya Methallov. (2008). Processing of Metal Radioactive Waste. Retrieved 10/08/2015, from http://www.technologiyametallov.com/englisch/oekologie_5.htm [Google Scholar]
  24. Suez Environment.. (2015). Tree Trunk and Roots. Retrieved 10/08/2015, from https://www.suez.com.au/en-AU/sustainability-tips/recycling-tips/tree-trunks-and-roots [Google Scholar]
  25. Hair, J.F., Black, W.C., Babin, B.J., & Anderson, R.E. (2010). Multivariate Data Analysis. Seventh Edition. Prentice Hall, Upper Saddle River, NewJersey [Google Scholar]
  26. Kometa, S.T., Olomolaiye, P.O., & Harris, F.C. (1994). Attributes of UK construction clients influencing project consultants’ performance. Construction Management & Economics, 12(5), 433. [Google Scholar]
  27. Mahayuddin, S.A. (2011) Penjanaan, Komposisi dan Pengurusan Sisa binaan: Kajian Kes Ipoh, Perak. Ph.D thesis, Universiti Kebangsaan Malaysia [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.