Open Access
Issue
MATEC Web Conf.
Volume 66, 2016
The 4th International Building Control Conference 2016 (IBCC 2016)
Article Number 00052
Number of page(s) 10
DOI https://doi.org/10.1051/matecconf/20166600052
Published online 13 July 2016
  1. J. Abreu, P. V. Martins, S. Fernandes, M. Zacarias Business Processes Improvement on Maintenance Management. Procedia Technology, 9(2013), 320–330 [CrossRef] [Google Scholar]
  2. Hamzah, S., Kobayashi, K. Utilising Mid-Long Term Maintenance Management Policy for Sustainable Maintenance of Infrastructure Facilities. Procedia Environmental Sciences, 17(2013), 478–484 [CrossRef] [Google Scholar]
  3. Z. Ismail System development toward effective maintenance management practices. Built Environment Project and Asset Management, 4(4), 406–422 (2014) [Google Scholar]
  4. Z. A. Hamid, K. A. M. Kamar, M. Z. M. Zain, M. K. Ghani, A. H. A. Rahim Industrialised Building System (IBS) in Malaysia: The Current State and R & D Initiatives. Malaysian Construction Research Journal, (MCRJ), 1(2), 1–11 (2008) [Google Scholar]
  5. M. Gajzler The Support of Building Management in the Aspect of Technical Maintenance. Procedia Engineering, 54(2013), 615–624 [CrossRef] [Google Scholar]
  6. C. J. Anumba, C. Baugh, M. M. Khalfan Organisational Structures to Support Concurrent Engineering in Construction. Industrial Management & Data Systems, 102(5), 260–270 (2002) [CrossRef] [Google Scholar]
  7. M. N. M. Nawi, N. A. Salleh, H. S. A Anuar Review Study of Maintenance and Management Issues in IBS Commercial Building. International Journal of Computer Informatics & Technological Engineering, 1(1), 42–46 (2014) [Google Scholar]
  8. G. Girmscheid, T. Rinas Business Design Modeling for Industrialization in Construction: Cooperative Approach. Journal of Architectural Engineering, 18(2012), 164–175 [CrossRef] [Google Scholar]
  9. B. Wood Maintenance Integrated Design and Manufacture of Buildings: Toward a Sustainable Model. Journal of Architectural Engineering, 18(2012), 192–197 [CrossRef] [Google Scholar]
  10. V. Singh, N. Gu, X. A Wang Theoretical Framework of a BIM-Based Multi-Disciplinary Collaboration Platform. Automation in Construction, 20(2), 134–144 (2011) [CrossRef] [Google Scholar]
  11. Z. Zahrizan, N. M. Ali, A. T. Haron, A. Marshall-Ponting, Z. A. Hamid Exploring the Adoption of Building Information Modelling (BIM) in the Malaysian Construction Industry: A Qualitative Approach. International Journal of Research in Engineering and Technology, 2(8), 384–395 (2013) [Google Scholar]
  12. P. A. P. Ruiz, B. Kamsu-Foguem, D. Noyes Knowledge Reuse Integrating the Collaboration from Experts in Industrial Maintenance Management. Knowledge-Based Systems, 50(2013), 171–186 [CrossRef] [Google Scholar]
  13. B. Kamsu-Foguem, D. Noyes Graph-Based Reasoning in Collaborative Knowledge Management for Industrial Maintenance. Computers in Industry, 64(2013), 998–1013 [CrossRef] [Google Scholar]
  14. N. O. Nawari BIM Standard in Off-Site Construction. Journal of Architectural Engineering, 18(2), 107–113 (2012) [CrossRef] [Google Scholar]
  15. J. C. P. Cheng, L. Y. H. A Ma BIM-based System for Demolition and Renovation Waste Estimation and Planning. Waste Management, 33(2013), 1539–1551 [CrossRef] [Google Scholar]
  16. L. Mahdjoubi, C. Moobela, R. Laing Providing Real-Estate Services through the Integration of 3D Laser Scanning and Building Information Modelling. Computers in Industry, 64(2013), 1272–1281 [CrossRef] [Google Scholar]
  17. J. Irizarry, E. P. Karan, F. Jalaei Integrating BIM and GIS to Improve the Visual Monitoring of Construction Supply Chain Management. Automation in Construction, 31(2013), 241–254 [Google Scholar]
  18. M. Marzouk, A. Abdelaty BIM-based Framework for Managing Performance of Subway Stations. Automation in Construction, 41(2014), 70–77 [CrossRef] [Google Scholar]
  19. P. E. D. Love, J. Matthews, I. Simpson, A. Hill, O. A. A Olatunji Benefits Realization Management Building Information Modeling Framework for Asset Owners. Automation in Construction, 37(2014), 1–10 [CrossRef] [Google Scholar]
  20. P. E. D. Love, I. Simpson, A. Hill, C. Standing From Justification to Evaluation: Building Information Modeling for Asset Owners. Automation in Construction, 35(2013), 208–216 [CrossRef] [Google Scholar]
  21. R. Miettinen, S. Paavola Beyond the BIM Utopia: Approaches to the Development and Implementation of Building Information Modeling. Automation in Construction, 43(2014), 84–91 [Google Scholar]
  22. R. Volk, J. Stengel, F. Schultmann Building Information Modeling (BIM) for Existing Buildings - Literature Review and Future Needs. Automation in Construction, 38(2014), 109–127 [Google Scholar]
  23. M. Rashidi, B. A Lemass Decision Support Methodology for Remediation Planning of Concrete Bridges. KICEM Journal of Construction Engineering and Project Management, 1(2), 1–10 (2011) [CrossRef] [Google Scholar]
  24. R. Yunus, J. Yang Critical Sustainability Factors in Industrialised Building Systems. Construction Innovation, 12(4), 447–463 (2012) [Google Scholar]
  25. M. N. M. Nawi, A. T. Haron, Z. A. Hamid, K. A. M. Kamar, Y. Baharuddin Improving Integrated Practice through Building Information Modelling-Integrated Project Delivery (BIM-IPD) for Malaysian Industrialised Building Systems (IBS) Construction Projects. Malaysia Construction Research Journal (MCRJ), 15(2),1–15 (2014) [Google Scholar]
  26. Y. Wang, X. Wang, J. Wang, P. Yung, G. Jun Engagement of Facilities Management in Design Stage through BIM: Framework and a Case Study. Advances in Civil Engineering, 2013(2013), 1–8 [CrossRef] [Google Scholar]
  27. Z. Ismail, A. A. Mutalib, N. Hamzah Case Study to Analyse Problems and Issues in IBS Building Maintenance. International Journal of Applied Engineering Research, 11(1), 226–232 (2016) [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.