Open Access
Issue
MATEC Web of Conferences
Volume 59, 2016
2016 International Conference on Frontiers of Sensors Technologies (ICFST 2016)
Article Number 03005
Number of page(s) 5
Section Energy engineering and Applications
DOI https://doi.org/10.1051/matecconf/20165903005
Published online 24 May 2016
  1. D. Brown, Geothermal Reservoir Engineering 25, 233 (2000) [Google Scholar]
  2. F.Z. Zhang, P.X. Jiang, R.N. Xu, Applied Thermal Engineering 61, 236 (2013) [Google Scholar]
  3. C. Fouillac, B. Sanjuan, S. Gentier, C.L Isabelle, Carbon Capture and Sequestration 3, 3 (2004) [Google Scholar]
  4. R.J. Rosenbauer, K. Tamer, J.L. Palandri, Fuel Processing Technology 86, 1581 (2005) [CrossRef] [Google Scholar]
  5. A. Ueda, K. Kato, T. Ohsumi, T. Yajima, H. Ito, H. Kaieda, R. Meycalf, H. Takase, Geochemical Journal 39, 417 (2005) [Google Scholar]
  6. Y. Wan, T. Xu, K. Pruess, Geothermal Reservoir Engineering 36, SGP-TR-191 (2011) [Google Scholar]
  7. K. Pruess, M. Azaroual, Geothermal Reservoir Engineering 31, 386 (2006) [Google Scholar]
  8. K. Pruess, Geothermics 35, 351 (2006) [CrossRef] [Google Scholar]
  9. K. Pruess, Energy Conversion and Management 49, 1446 (2008) [Google Scholar]
  10. L. Lihui, S. Yuko, B. Greg, Y. Nakamichi, H. Energy Conversion and Management 44, 1399 (2003) [Google Scholar]
  11. A.D. Atrens, G. Hal, R. Victor, Geothermics 39, 161 (2010) [CrossRef] [Google Scholar]
  12. P.X. Jiang, Y.J. Xu, R.F Shi., S. He, J.D. Jackson, Applied Thermal Engineering 24, 1255 (2004) [Google Scholar]
  13. S.M. Liao, T.S. Zhao, International Journal of Heat and Mass Transfer 45, 5025 (2002) [CrossRef] [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.