Open Access
Issue
MATEC Web of Conferences
Volume 37, 2015
Smart Grids 2015
Article Number 01059
Number of page(s) 3
Section Investigation of Power Engineering Processes
DOI https://doi.org/10.1051/matecconf/20153701059
Published online 22 December 2015
  1. Dyakov A.S. About conversion of Russian research reactors (2015) [Google Scholar]
  2. IAEA Research Reactors Database, URL: http://nucleus.iaea.org/RRDB/RR/ReactorSearch.aspx?filter=0 (access date 12.09.2015). [Google Scholar]
  3. Arkhangelskiy N.V. Modern state and perspectives of works on reduction of HEU use in Russian research reactors, International conference «Global partnership of «G8» Evaluation of results and perspectives of further cooperation in the field of nuclear and radiation safety», Moscow, (2012) [Google Scholar]
  4. Izhutov A.L., Ovchinnikov V.A., Romanovskiy S.V., Svistunov V.A., Svyatkin M.N. NPP life extension and perspectives of using loop research reactor MIR, 13-th annual Russian meeting «Nuclear power plants safety», Dimitrovgrad, (2011) [Google Scholar]
  5. Starkov V.A., The Status of Testing LEU U-Mo Full Size IRT Type Fuel Elements and Mini-Elements in the MIR Reactor, Progress, Challenges, and Opportunities for Converting U.S. and Russian Research Reactors: A Workshop Report, the National Academies Press, Washington D.C., (2012) [Google Scholar]
  6. Common statement of SAEC ‘Rosatom’ and United States Department of Energy on strategic directions of cooperation of the Russian Federation and the USA in the nuclear field. URL:http://www.rosatom.ru/resources/e6ab250048a712729d44dddb97771387/sz_strateg_napravl.pdf (access date 20.09.2011) [Google Scholar]
  7. Research of reasons for technological possibility to convert research reactor MIR-M1 to reduced enrichment uranium fuel in JSC “SSC NIIAR”, Dimitrovgrad, 2010. [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.