Open Access
Issue
MATEC Web of Conferences
Volume 10, 2014
Building Surveying and Technology Undergraduate Conference
Article Number 01002
Number of page(s) 9
Section Keynotes
DOI https://doi.org/10.1051/matecconf/20141001002
Published online 19 March 2014
  1. H. Nurul Azam, A.R. Hamzah, H. Mahanim, A Literature Review of the Advantages and Barriers to the Implementation of Industrialied Building System (IBS) in Construction Industry. Malaysian Construction Research Journal, 4 (1) (2009) 10–14. [Google Scholar]
  2. CIDB, IBS Strategic Plan 1999 -2003, Construction Industry Development Board (CIDB), Kuala Lumpur, 1999, pp: 4–6 [Google Scholar]
  3. IBS Survey, Construction Industry Development Board Malaysia (CIDB), Kuala Lumpur, 2003 [Google Scholar]
  4. A. Kazaz, S. Ulubeyli, A Different Approach to Construction Labour in Turkey: Comparative Productivity Analysis, Journal of Building and Environment, 39 (2004) 93–100. [CrossRef] [Google Scholar]
  5. M.R. Abdul Kadir, W.P. Lee, M.S. Jaafar, S.M. Sapuan and A.A.A. Ali, Factors Affecting Construction Labour Productivity for Malaysian Residential Projects, Journal of Structural Survey. 23 (1) (2005) 42–54 [Google Scholar]
  6. W.A.M, Thanoon, L.W. Peng, M.R. Abdul Kadir, M.S. Jaafar, M.S Salit, The Experiences of Malaysia and Other Countries in Industrialized Building System in Malaysia, Proceeding on IBS Seminar. UPM, Malaysia, 2003. [Google Scholar]
  7. R. Abdul Rashid, A Model for an Effective Implementation of the Government Technology Transfer Policy in the Malaysian Construction Industry. Unpublished PhD Thesis. The University of Reading, 1998, 52–80 [Google Scholar]
  8. CIDB, IBS Roadmap 2011–2015, Construction Industry Development Board (CIDB), Kuala Lumpur, 2010. [Google Scholar]
  9. CIDB, Construction Industry Master Plan (CIMP 2006–2015). Construction Industry Development Board Malaysia (CIDB). Kuala Lumpur, 2007. [Google Scholar]
  10. K.S. Elliot, Mixed options for Precast Concrete Construction, Building Design and Construction, 2003. [Google Scholar]
  11. Y.F. Badir, M.R. Abdul Kadir, A.H. Hashim, Industrialized Building Systems Construction in Malaysia , Journal of Architectural Engineering, 8 (1) (2002) 19–23 [Google Scholar]
  12. E.M. Rojas, P. Aramvareekul, Labor Productivity Drivers and Opportunities in the Construction Industry, Journal of Management in Engineering, 2 (1) (2003) 78–82 [CrossRef] [Google Scholar]
  13. H.R. Thomas, A.S. Sakarcan, Forecasting Labor Productivity Using Factor Model, Journal of Construction Engineering and Management, 120 (1) (1994) 228–239 [CrossRef] [Google Scholar]
  14. C.H. Oglesby, H.W. Parker, G.A. Howell, Productivity Improvement in Construction, McGraw-Hill Inc., Unites State of America, 1989, 5–9 [Google Scholar]
  15. P.F. Kaming, P.O. Olomolaiye, G.D. Holt, F.C. Harris, Factors Influencing Craftsmen’s Productivity in Indonesia, International Journal of Project Management, 15 (1) (1997) 21–30 [Google Scholar]
  16. P.F. Kaming, G.D. Holt, S.T. Kometa and P.O. Olomolaiye. Severity Diagnosis of Productivity Problems – A Reliability Analysis. International Journal of Project Management. 16(2): 107–113 (1998). [Google Scholar]
  17. IBS Roadmap Review, IBS Centre, Construction Industry Development Board, Malaysia, Kuala Lumpur , 2007, pp: 11–15 [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.