Issue |
MATEC Web Conf.
Volume 388, 2023
2023 RAPDASA-RobMech-PRASA-AMI Conference Advanced Manufacturing Beyond Borders - The 24th Annual International RAPDASA Conference joined by RobMech, PRASA and AMI, hosted by CSIR and CUT
|
|
---|---|---|
Article Number | 04020 | |
Number of page(s) | 17 | |
Section | Robotics and Mechatronics | |
DOI | https://doi.org/10.1051/matecconf/202338804020 | |
Published online | 15 December 2023 |
4-RRS PKM for stabilisation on a mobile sensor platform
1 Centre for Robotics and Future Production, CSIR, Pretoria, South Africa
2 School of Mechanical, Industrial & Aeronautical Engineering, University of the Witwatersrand, Johannesburg, South Africa
* Corresponding author: kramruthan@csir.co.za
Disturbances experienced by an inspection robot can reduce the quality of its sensor measurements, which can in turn negatively affect the robot’s functionality. This research aimed to design a Parallel Kinematic Mechanism (PKM) for use as a stabilisation mechanism. The research focused on designing, simulating, building, testing, and analysing the mechanism. The PKM was modelled and simulated using MATLAB®, designed and developed using NX CAD software, and it was tested using a custom-built test rig that could simulate rotational disturbances. Using the metric of absement, the PKM significantly reduced the disturbances, depending on the disturbance induced.
© The Authors, published by EDP Sciences, 2023
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.