Issue |
MATEC Web Conf.
Volume 344, 2021
International Scientific and Practical Conference “Modern Problems and Directions of Development of Metal Science and Heat Treatment of Metals and Alloys, Dedicated to the Memory of Academician A. A. Baykov” (MPM 2021)
|
|
---|---|---|
Article Number | 01014 | |
Number of page(s) | 6 | |
DOI | https://doi.org/10.1051/matecconf/202134401014 | |
Published online | 01 October 2021 |
Validation of functionability of transition metal and its alloys at the simultaneous introduction of two oxidizing agents in the volume of liquid phase
Southwest State University, 305040 Kursk, Russia
* Corresponding author: pozhidaeva_kursk@mail.ru
At the chemical process in the volume of a liquid reaction mixture in the presence of two specific groups of oxidizers in a metal reactor or reactor using metal elements, favourable conditions for abnormally rapid oxidation of the metal with subsequent destruction at room or close to them temperatures may appear. The condition for destruction is the process according to the cycle scheme with the regeneration of the metal oxidizer, which may initially be present in the system in catalytic or close to them quantities. In the presence of several metal elements, the destruction occurs all at the same time, but in different proportions. As a result, this leads to a deterioration in the characteristics of the process, and the process of destruction in the apparatus (reactor) can be accompanied by the emergence of a far unsafe, unpredictable situation.
© The Authors, published by EDP Sciences, 2021
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.