Model of indirect Expenses Distribution for Determining Economies of Scale
1
Transilvania University of Brasov, Department of Engineering and Industrial Management, University Street 1 Brasov, Romania
2
Transilvania University of Brasov, Department of Engineering and Industrial Management, University Street 1 Brasov, Romania
3
Transilvania University of Brasov, Department of Engineering and Industrial Management, University Street 1 Brasov, Romania
* Gavrilă Calefariu: gcalefariu@unitbv.ro
Changing economic environment, innovative production technologies and the need to obtain relevant information in decisionmaking, management determines the organizations to seek different approaches to identify economies of scale. Economies of scale are manifested as an effect of cost reduction. The article proposes a comparative analysis of two methods of establishing costs that allow the identification and quantification of economies of scale. The research proposes a distribution of indirect costs depending on the cause-effect relationship between activity and product. The research results show a cost difference in the case of implementing the Activity-based costing (ABC) cost system, thus recognizing the usefulness and compatibility of the method.
© The Authors, published by EDP Sciences, 2021
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.