Issue |
MATEC Web Conf.
Volume 311, 2020
IX Czarnowski Readings – Annual International Scientific and Practical Conference on the Organization of Production and Industrial Policy
|
|
---|---|---|
Article Number | 02023 | |
Number of page(s) | 4 | |
Section | Section Meetings | |
DOI | https://doi.org/10.1051/matecconf/202031102023 | |
Published online | 23 March 2020 |
Fuzzy-interval modification of the earned value method in manufacturing digitalization project management
Assistant of the department «Entrepreneurship and foreign economic activity» Bauman University, Moscow
The specifics of managing complex projects of digital transformation of the industry are considered, the problems of decision making in conditions of uncertainty, insufficient formalization and structuring of tasks are disclosed. A methodological approach to the fuzzyinterval assessment of the indicators of the mastered volume in the management of production digitalization projects is proposed. Directions for the implementation of the proposed approach in expert and recommendation systems are determined.
Key words: manufacturing digitalization / decision making / project management / earned value method / fuzzy logic / fuzzy-interval estimation
© The Authors, published by EDP Sciences, 2020
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.