Issue |
MATEC Web Conf.
Volume 311, 2020
IX Czarnowski Readings – Annual International Scientific and Practical Conference on the Organization of Production and Industrial Policy
|
|
---|---|---|
Article Number | 02011 | |
Number of page(s) | 7 | |
Section | Section Meetings | |
DOI | https://doi.org/10.1051/matecconf/202031102011 | |
Published online | 23 March 2020 |
Software product management: planning tool integration
1 Docent, candidate of technical sciences, Vologda State University, Vologda
2 Postgraduate, Vologda State University, Vologda
The article discusses the problems of using software for project management and calculating the complexity of design work on the example of planning projects for the production of software products. Approaches to using project management standards and the project subject area to form a work breakdown structure, calculating the complexity of individual work packages and the project as a whole are investigated, requirements for integration software are formulated.
Key words: work breakdown structure / labor calculator / project management / product life cycle processes
© The Authors, published by EDP Sciences, 2020
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.