Issue |
MATEC Web Conf.
Volume 305, 2020
9th International Symposium on Occupational Health and Safety (SESAM 2019)
|
|
---|---|---|
Article Number | 00037 | |
Number of page(s) | 7 | |
DOI | https://doi.org/10.1051/matecconf/202030500037 | |
Published online | 17 January 2020 |
Importance of training the personnel performing specific activities related to equipment / installations operating in areas classified as with potentially explosive atmospheres
1
National Institute for Mine Safety and Protection to Explosion INSEMEX, Department for Safety of Installations and Explosion-proof Equipment, 32-34 G-ral Vasile Milea, Petrosani, Romania
2
University of Petrosani, Department of Environmental Engineering and Geology, 20 University street, Petrosani, Romania
* Corresponding author: lucian.moldovan@insemex.ro
Equipment operating in installations endangered by the occurrence of potentially explosive atmospheres have special features designed in order to make them suitable for operations in such areas. Equipment designed for use in potentially explosive atmospheres shall be placed on the EU market considering the provisions of the ATEX Directive 2014/34/EU and the harmonized European standards under this Directive. Even if equipment is placed on the EU market in accordance with ATEX Directive 2014/34/EU provisions, the special characteristics providing protection to explosion can be invalidated in installation design, erection, operation, inspection, maintenance or repairing phases. In order to prevent invalidation of explosion protection characteristics an important accent is placed on training and authorization of personnel involved in design, mounting, operation, inspection, maintenance or repairing of equipment/installations operating in potentially explosive atmospheres.
© The Authors, published by EDP Sciences, 2019
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.