Issue |
MATEC Web Conf.
Volume 289, 2019
Concrete Solutions 2019 – 7th International Conference on Concrete Repair
|
|
---|---|---|
Article Number | 03005 | |
Number of page(s) | 7 | |
Section | Electrochemical Repair | |
DOI | https://doi.org/10.1051/matecconf/201928903005 | |
Published online | 28 August 2019 |
Residual protection on a wharf structure following application of impressed current cathodic protection
School of Engineering, RMIT University, Melbourne, VIC, 3001, Australia
* Corresponding author: David.Law@rmit.edu.au
Recent studies have suggested that residual protection is afforded to structures following the application of impressed current cathodic protection (ICCP), in some cases for significant periods of time, while others for periods of only a few days. This study reported the findings of the de-activation of a 20 year old ICCP system installed on a 50 year old structure. The ICCP was de-activated for 84 days and the steel potentials at locations on the front pile cap and front wall were monitored via the installed reference electrodes. An adjacent water anode system was also de-activated for 48 hours during the initial de-activation period to observe the impact on the steel potentials. The results showed that out of 42 reference electrodes, 17 achieved a 100 mv decay within 24 hours and 10 had more positive instant off potentials than -150 mV. Furthermore, all displayed a positive shift in potential following deactivation of the ICCP system for a period of time, indicative of residual protection, with 22 displaying this positive shift for the whole 94 days of the trial.
© The Authors, published by EDP Sciences, 2019
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.