Issue |
MATEC Web Conf.
Volume 279, 2019
10th International Scientific Conference Building Defects (Building Defects 2018)
|
|
---|---|---|
Article Number | 02011 | |
Number of page(s) | 5 | |
Section | Mechanical and Materials Engineering | |
DOI | https://doi.org/10.1051/matecconf/201927902011 | |
Published online | 12 April 2019 |
Possibilities of Use Recycled Materials in Construction Details
Brno University of Technology, Faculty of Civil Engineering, Institute of Building Structures, Veveří 95, 602 00 Brno, Czech Republic
Corresponding author: smolka.r@fce.vutbr.cz
This paper aims to explain the use of secondary materials in design details. Primarily, attention is paid to flat roofs, for which there is currently a wide range of technologies needed for user-friendly operation of a building. Recycled materials are still often looked down on and, therefore, it is important to show that even these elements may work very well in constructions. They must meet strict criteria for static and thermal properties. Furthermore, they must comply with fire and weather resistance requirements. They also have acoustic, secondary and aesthetic function. The roof structure is one of the basic segments that characterize the final properties of the building. Any malfunctions will lead to increased economic costs and degradation of users’ environment.
© The Authors, published by EDP Sciences, 2019
This is an open access article distributed under the terms of the Creative Commons Attribution License 4.0 (http://creativecommons.org/licenses/by/4.0), which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.