Issue |
MATEC Web Conf.
Volume 275, 2019
1st International Conference on Advances in Civil Engineering and Materials (ACEM1) and 1st World Symposium on Sustainable Bio-composite Materials and Structures (SBMS1) (ACEM2018 and SBMS1)
|
|
---|---|---|
Article Number | 03001 | |
Number of page(s) | 6 | |
Section | Geotechnical and Tunnel Engineering | |
DOI | https://doi.org/10.1051/matecconf/201927503001 | |
Published online | 13 March 2019 |
Optimization method and application research of dewatering design for complicated foundation pits
Zhejiang Shunjiang Construction Group CO.LTD, Shaoxing, Zhejiang Province, 312300, China
The groundwater control system of complex deep foundation pit engineering is designed based on experience and analysis of items such as dewatering, anti-inrushing, water-recharging, etc. Three-dimensional numerical simulation methods are used to optimize the design. By repeatedly adjusting the design items and simulating the working system, a safer, more reasonable and economical design scheme can be confirmed by comparing the analysed results.
© The Authors, published by EDP Sciences, 2019
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.