Issue |
MATEC Web Conf.
Volume 275, 2019
1st International Conference on Advances in Civil Engineering and Materials (ACEM1) and 1st World Symposium on Sustainable Bio-composite Materials and Structures (SBMS1) (ACEM2018 and SBMS1)
|
|
---|---|---|
Article Number | 01003 | |
Number of page(s) | 4 | |
Section | Bio-composite Materials and Structures | |
DOI | https://doi.org/10.1051/matecconf/201927501003 | |
Published online | 13 March 2019 |
Experimental Investigation on OSB Webbed Laminated Bamboo Lumber Box Shaped Joists
College of Civil Engineering, Nanjing Forestry University, Nanjing 210037, China
* Corresponding author: chenguo@njfu.edu.cn
A novel bamboo-wood box beam was introduced in this paper, which consisted of laminated bamboo lumber flanges and OSB webs. Four-point bending tests were conducted on composite beams to investigate the effects of shear span ratio and stiffeners on failure mode and strength. The results showed that the composite beams with shear span ratio less than two failed in web shear failure, but for the others, the beams failed in twist and delamination of OSB in flanges. The load carrying capacity of beams decreased with the increase of shear span ratio. However, the mechanical performance of beams can be improved moderately by the presence of stiffeners, and theultimate bearing capacity and initial stiffness was increased by 16.5% and 13.1% respectively.
© The Authors, published by EDP Sciences, 2019
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.