Issue |
MATEC Web Conf.
Volume 239, 2018
Siberian Transport Forum - TransSiberia 2018
|
|
---|---|---|
Article Number | 05002 | |
Number of page(s) | 9 | |
Section | Road Construction | |
DOI | https://doi.org/10.1051/matecconf/201823905002 | |
Published online | 27 November 2018 |
Research of interaction of the “train – bridge” system with bridge deck resonant vibrations
Emperor Alexander I St. Petersburg State Transport University, Russia
* Corresponding author: leonid_dyachenko@mail.ru
When designing bridges on high-speed railways, special attention should be paid to ensuring the safety of train traffic and the comfort of passengers. On high-speed railways, the proportion of the length of bridge structures in the composition of the entire route is much larger than on conventional railways, which makes the present study relevant. In this paper based on numerical simulation, the results of the study of the motion of a high-speed train along bridge structures in the resonance mode of vibrations are presented. In this formulation, special attention was paid to the control of dynamic phenomena at the level of the “wheel-rail” contact. The dynamics of loose parts of the train car determines the magnitude of the contact force, which in turn characterizes the possible detachable movement of the wheel, which is inadmissible for the safety of the train. Analysis of the obtained results, using the example of a 50 m long simple span structure developed for the Moscow-Kazan high-speed railway, allows us to conclude that the resonant nature of the vibrations of simple beam is not a critical phenomenon.
© The Authors, published by EDP Sciences, 2018
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.