Issue |
MATEC Web Conf.
Volume 220, 2018
2018 The 2nd International Conference on Mechanical, System and Control Engineering (ICMSC 2018)
|
|
---|---|---|
Article Number | 05005 | |
Number of page(s) | 4 | |
Section | Mechanical and Electronic Engineering | |
DOI | https://doi.org/10.1051/matecconf/201822005005 | |
Published online | 29 October 2018 |
Renewable-integrated Traffic Energy
1 Process Energy and Environmental Technology Station, University of Johannesburg, South Africa
2 Electrical & Electronics Department, University of Johannesburg, South Africa
This work is a development of an indigenous technology combined Flap-motor power generator (FMPG) and PV system that harnesses the free renewable energies in rural area to generate electricity. FMPG and solar renewable energy power technologies are affordable, clean and sustainable and can replace or supplement power generator for road traffic signal light. Combined energy systems integrate these renewable energy technologies with flap base car passing power generators, PV and batteries to provide road signal power in remote areas not connected to a utility grid. Such an isolated grid will help to supply electricity for traffic signal to avoid road accident and maximum vehicle efficiency at intersections. This power generation device will provide constant power supply while no sunlight for long days. At the same time technology will represent instance power supply for rural area traffic light electrification system without grid connection.
© The Authors, published by EDP Sciences, 2018
This is an Open Access article distributed under the terms of the Creative Commons Attribution License (http://creativecommons.org/licenses/by/4.0), which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.