Method for calculating the maximum number of railway cars in a cut
Siberian Transport University, 630049 Novosibirsk, Russia
* Corresponding author: aklimov@ngs.ru
A shunting process in hump yards has a number of technical and technological constraints, one of which is the maximum permissible number of cars in a cut. This constraint increases the number of cuts, time of shunting, operating costs of car handling operations in a railways network, while reducing the safety level of classification. The purpose of the paper is to maximize the handling capacity of hump yards by reasonably increasing the permissible length of cuts. The current methods of calculation do not take into account some features of classification operations with long cuts of cars. The proposed method is based on probability calculations and simulation modeling of the shunting process in hump yards. The authors identified the critical factors limiting the maximum permissible number of cars in a cut and developed a method to determine this limitation.
© The Authors, published by EDP Sciences, 2018
This is an Open Access article distributed under the terms of the Creative Commons Attribution License (http://creativecommons.org/licenses/by/4.0), which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.