Issue |
MATEC Web Conf.
Volume 204, 2018
International Mechanical and Industrial Engineering Conference 2018 (IMIEC 2018)
|
|
---|---|---|
Article Number | 04011 | |
Number of page(s) | 6 | |
Section | Energy | |
DOI | https://doi.org/10.1051/matecconf/201820404011 | |
Published online | 21 September 2018 |
Performance testing of a downdraft biomass gasifier stove for cooking applications
Sustainable Energy Research Center, Department of Energy Engineering, Faculty of Industrial Technology, Phranakhon Rajabhat University, 10220 Bangkok, Thailand.
*
Corresponding author: woranuch@pnru.ac.th
A down draft biomass gasifier stove with four steps of cleaning gas system was developed to produce the producer gas for replacing LPG for cooking applications in lunch project for the student in rural school area. This project has been implemented at Bangrakam primary school that located at Pitsanuloke Province, Thailand. The biomass fuels used are Mimosa wood twigs. The gasifier stove was developed based on down draft fixed bed gasifier with the maximum fuel capacity of fourteen kilograms. The performance testing of the biomass gasifier stove showed that the heating value of the producer gas is 4.12 MJ/Nm3 with the thermal efficiency in the percentage of 85.49. The results from this study imply that it has high potential to replace LPG with producer gas.
© The Authors, published by EDP Sciences, 2018
This is an Open Access article distributed under the terms of the Creative Commons Attribution License (http://creativecommons.org/licenses/by/4.0), which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.