Issue |
MATEC Web Conf.
Volume 204, 2018
International Mechanical and Industrial Engineering Conference 2018 (IMIEC 2018)
|
|
---|---|---|
Article Number | 03015 | |
Number of page(s) | 7 | |
Section | Manufacture and System Design | |
DOI | https://doi.org/10.1051/matecconf/201820403015 | |
Published online | 21 September 2018 |
Towards the greenship assessment and certificate of new building Design Recognition (DR) for the design of IDB-funded integrated classroom building Universitas Negeri Malang, Indonesia
Civil Engineering Department, Universitas Negeri Malang, 65145 Malang, Indonesia
*
Corresponding author: apif.miptahul.ft@um.ac.id
To foster Universitas Negeri Malang (UM) as the Center of Excellence in Learning Innovation, with the support from the Islamic Development Bank (IDB), two 9-storeys integrated classroom buildings will be built, having the total built area about 44,800 sqm, which are divided exactly in two rectangle-shaped towering blocks. The buildings are projected to have green building status for Design Recognition (DR) by approaching GBCI’s greenship rating system. By using DED documents of the buildings, this study analyzes technical and engineering aspects to fulfill greenship requirements and recommends a specific level of greenship. The results show that overall targeted score is 47 and recommend Gold level of greenship.
© The Authors, published by EDP Sciences, 2018
This is an Open Access article distributed under the terms of the Creative Commons Attribution License (http://creativecommons.org/licenses/by/4.0), which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.