Life Cycle Equivalent Annual Cost (LCEAC) as a Comparative Indicator in the Life Cycle Cost Analysis of Buildings with Different Lifetimes
Cracow University of Technology, Faculty of Civil Engineering, Institute of Construction Management,
31-155 Kraków,
Warszawska street 24,
Poland
*
Corresponding author : eplebank@L3.pk.edu.pl
The paper deals with the issue of the life cycle cost in the construction. It also focuses on the part of the model for the calculation of the life cycle cost of buildings with consideration of the risk that allows the calculation of the life cycle cost of buildings with different lifetimes. For the construction of this part of the model, the authors used the life cycle equivalent annual cost indicator (LCEAC). The operation of this part of the model was presented on the example of three scenarios of the life cycle of pneumatic sports halls for which the estimated service life of the building (ESLB) was ranged from 19 to 30 years.
© The Authors, published by EDP Sciences, 2018
This is an Open Access article distributed under the terms of the Creative Commons Attribution License (http://creativecommons.org/licenses/by/4.0), which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.