Example of development of production schedule in the reorganization of residential areas
Moscow State University of Civil Engineering, 26, Yaroslavskoe Shosse, 129337, Moscow, Russia
Corresponding author: sasin50@mail.ru
Reducing production in case of significant problems with production capacity is not a popular solution for many managers, but the benefits of such a solution may be unexpected. Firstly, the economic performance of production can be really improved because the reduction of work intensity eliminates clutter and disorder in the work centers, which led to additional costs. Secondly, the quality of work (and, as a consequence, the convenience of further recycling or reuse in the case of demolition) may improve, as in a normal environment it will be given more attention. Perhaps the solution Manager can be an organization overtime or events of a technical nature, which, however, do not always have the desired flexibility. Redistribution of the flow to other work centers is provided as a result of solving the assignment problem.
© The Authors, published by EDP Sciences, 2018
This is an Open Access article distributed under the terms of the Creative Commons Attribution License (http://creativecommons.org/licenses/by/4.0), which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.