Features of calculations of the limit cost of high-rise constructions for housing and civil purposes with the use of consolidated standards
Voronezh State Technical University, 20 let Oktyabrya st., 84, 394006, Voronezh, Russia
Corresponding author: ovsyannikovas@yandex.ru
When determining the cost of capital construction objects, for purposes of pre-investment workings out and purposes of initial maximum initial price determination on tenders, construction price norms are used (CPNs). Modern CPNs are not designed to determine the value of high-rise buildings. It is necessary to adapt modern CPNs to get opportunity for the possibility to take into account special cost factors in determining the cost of high-rise buildings. The main ways can be: selection of new representative objects or application of additional correction factors.
© The Authors, published by EDP Sciences, 2018
This is an Open Access article distributed under the terms of the Creative Commons Attribution License (http://creativecommons.org/licenses/by/4.0), which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.