Issue |
MATEC Web Conf.
Volume 184, 2018
Annual Session of Scientific Papers IMT ORADEA 2018
|
|
---|---|---|
Article Number | 04004 | |
Number of page(s) | 6 | |
Section | Management and Economics in Engineering | |
DOI | https://doi.org/10.1051/matecconf/201818404004 | |
Published online | 31 July 2018 |
Comparative analysis for estimating production costs
1
Technical University of Cluj-Napoca, Department Electrical Machines and Drives, Cluj-Napoca, România
2
Technical University of Cluj-Napoca, Department Electrical Machines and Drives, Cluj-Napoca, România
*
carmen.stoenoiu@emd.utcluj.ro
The analysis of the cost of production is a complex problem, being very useful in the planning and control process as well as in production and sales. In this study, this was done using three methods: accounting analysis, high-low and regression analysis that allowed cost elements to be identified through a cost equation that can be used in planning and control analysis or in sales activity. At the same time, the evolution of the cost elements was achieved using two estimates used by the accounting method. The High-Low method allowed the determination of the minimum and maximum activity level at one year's level, which was then analyzed through the company's available activity range. The multivariate regression analysis determined the analysis of the obtained model, being linear, thus establishing the production line.
© The Authors, published by EDP Sciences, 2018
This is an Open Access article distributed under the terms of the Creative Commons Attribution License (http://creativecommons.org/licenses/by/4.0), which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.