Issue |
MATEC Web Conf.
Volume 181, 2018
The 1st International Symposium on Transportation Studies for Developing Countries (ISTSDC 2017)
|
|
---|---|---|
Article Number | 06004 | |
Number of page(s) | 7 | |
Section | Traffic Engineering and Management | |
DOI | https://doi.org/10.1051/matecconf/201818106004 | |
Published online | 30 July 2018 |
Estimated travel time between the city (Case study: Waru Street-Mojokerto)
Brawijaya University, Faculty of Engineering, Malang, Indonesia
*
Corresponding author: budieswe@yahoo.co.id
The area in Surabaya and Mojokerto is an industrial area that is increasing quite rapidly. Based on City Mojokerto in Figures Year 2016. From an industrial estate is a change of land use from agriculture or ponds into settlements and / or industries. The occurrence of congestion along this road because of the capacity that is not sufficient to accommodate the number of vehicles passing. The purpose of this research is to know the model of land use interaction, knowing the network performance and know the travel time to be passed. And analyze what components affect the calculation of travel time. Necessary data. The existing land layout along the road and the average traffic calculation data on the road in the study area. To know the travel time must be known in advance the capacity of the road that can be accommodated along the road. After the capacity is known the service performance becomes the main factor in determining road network performance. This research uses regression analysis for land use modeling.
© The Authors, published by EDP Sciences, 2018
This is an Open Access article distributed under the terms of the Creative Commons Attribution License (http://creativecommons.org/licenses/by/4.0), which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.