Issue |
MATEC Web Conf.
Volume 162, 2018
The 3rd International Conference on Buildings, Construction and Environmental Engineering, BCEE3-2017
|
|
---|---|---|
Article Number | 03001 | |
Number of page(s) | 9 | |
Section | Water Resources Engineering and Geomatics | |
DOI | https://doi.org/10.1051/matecconf/201816203001 | |
Published online | 07 May 2018 |
The performance of hydraulic jump over rough bed stilling basin consisting of cubic-shape elements
Building and Construction Dept., University of Technology, Baghdad, Iraq
Three groups of cubic roughness elements non-protruding to the flow were fixed with a specific configuration at the downstream of a stream lined lib sluice gate. The aim was to test the performance of the hydraulic jump under using such elements as appurtenances of stilling basin. The experimental works has been conducting to test; four different intensities, I=8%, 10%, 12% and 16%; three width to height ratios, We/he=0.75, 1.5 and 2; and three length to height ratios, Le/he=0.75, 2 and 4, of cubic elements made from waterproof stiff rubber. The test was performed under the incoming Froude number; F1 ranged between 2.7 to 9. After analysing the experimental data one from the second group configuration gives a higher reduction of sequent depth ratio, y2/y1 as compared with the depth ratio of the un-forced hydraulic jump which calculated by Belanger equation, this decreases arrived 20%. Also greater relative energy has been dissipated, and the gain in dissipation (%GED) ranged between 10.8-22.3%.
© The Authors, published by EDP Sciences, 2018
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited. (http://creativecommons.org/licenses/by/4.0/).
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.