Scheduling of Aircraft Design Project: A Comparison of Critical Path Method, Design Structure Matrix and Genetic Algorithm Approaches
Industrial Engineering Department, Universitas Indonesia
* Corresponding author: mdachyar@yahoo.com
The purpose of this study to minimize the overall duration of aircraft design project in Indonesia. This study proposes a combination method of Design Structure Matrix (DSM) and Genetic Algorithm (GA) for scheduling aircraft design project activities. DSM is used to identify the information flow between project activities. GA use reworks data, which was the result output of DSM, and activity duration to optimize the task sequence by considering the human resource constraints. A comparative analysis was conducted between the schedule based on DSM and GA and schedule based on Critical Path Method. Combination of DSM and GA obtained 63 days shorter project durations compared to CPM. This research is convenient for design projects scheduling with limited resources that can be obtained by using alternative methods other than traditional methods.
© The Authors, published by EDP Sciences, 2018
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.