Planning of River System Connection Project in Panggong District of Xiangyang
1 Changjiang Survey, Planning, Design and Research Co., Ltd. Wuhan, China
2 Wuhan East Lake High-tech Development Zone. Wuhan, China
a Corresponding author: sunlingkai@cjwsjy.com.cn
Panggong District, surrounded by the Han River on three sides, is close to Xiangyang Ancient City. It is the key area of strategic layout of Xiangyang’s urbanization development. The low-lying topography and high-level underground water with a lack of drainage channel and rainwater storage area cause a serious problem of drainage and waterlogging prevention in this region. A river system connection project was planned to solve this problem, in which new river systems were excavated and necessary gates and pumping stations were constructed to improve the capacity of drainage and waterlogging prevention of the region. Furthermore, the operation schemes of the connection project were determined in flood season and dry season, the project benefit was analysed, and related problems were discussed.
© The Authors, published by EDP Sciences, 2018
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.