Issue |
MATEC Web Conf.
Volume 246, 2018
2018 International Symposium on Water System Operations (ISWSO 2018)
|
|
---|---|---|
Article Number | 02019 | |
Number of page(s) | 7 | |
Section | Parallel Session I: Water Resources System | |
DOI | https://doi.org/10.1051/matecconf/201824602019 | |
Published online | 07 December 2018 |
Optimization of Drainage Schemes for the Dike Strengthening by Warping Construction Project in the Qinhe River under Restricted Drainage Condition
Yellow River Institute of Hydraulic Research, 450003 Zhengzhou, China
a Corresponding author:
Dike strengthening by warping construction is one of the main construction modes for the standardized dike construction of mainstream and tributaries in the lower reaches of the Yellow River, and whether the drainage in the dike strengthening by warping construction is smooth is closely related to the safety of dike project. Restricted by topographic conditions and construction conditions, existing drainage schemes are not applicable to the Qinhe River (the Yellow River’s largest tributary) Flood Prevention Project Wuzhi Section, which is next to farm cottage. Therefore, in this paper a field test was carried out using three drainage schemes---“L” type PVC seepage drainage pipes through dike, “L” type perforated PVC seepage drainage pipes coated with geotextile and geotextile drainage grilles. The drainage velocity, silt retaining effect, water level in the silt area, dike body deformation and other key indicators were obtained through field monitoring, and the safety and stability of the dike strengthening by warping construction project were verified by numerical calculation. The field test results showed that the drainage effect of the “L” type perforated PVC seepage drainage pipes coated with geotextile and geotextile drainage grilles was obviously better than that of the “L” type PVC seepage drainage pipes through dike, but the geotextile drainage grilles had advantages in silt retaining effect, construction convenience, cost, and improvement. The field test results can provide a reference for the quick drainage design and construction of dike back deposited with silt of the dike strengthening by warping construction project in the Yellow River.
© The Authors, published by EDP Sciences, 2018
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.