Issue |
MATEC Web Conf.
Volume 148, 2018
International Conference on Engineering Vibration (ICoEV 2017)
|
|
---|---|---|
Article Number | 06002 | |
Number of page(s) | 4 | |
Section | Dynamics of Composite and Smart Structures | |
DOI | https://doi.org/10.1051/matecconf/201814806002 | |
Published online | 02 February 2018 |
Synchronisation phenomenon in three blades rotor driven by regular or chaotic oscillations
Department of Applied Mechanics, Lublin University of Technology, Nadbystrzycka 36, 20-618 Lublin, Poland
* e-mail: z.szmit@pollub.pl
** e-mail: j.warminski@pollub.pl
The goal of the paper is to analysed the influence of the different types of excitation on the synchronisation phenomenon in case of the rotating system composed of a rigid hub and three flexible composite beams. In the model is assumed that two blades, due to structural differences, are de-tuned. Numerical calculation are divided on two parts, firstly the rotating system is exited by a torque given by regular harmonic function, than in the second part the torque is produced by chaotic Duffing oscillator. The synchronisation phenomenon between the beams is analysed both either for regular or chaotic motions. Partial differential equations of motion are solved numerically and resonance curves, time series and Poincaré maps are presented for selected excitation torques.
© The Authors, published by EDP Sciences, 2018
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited. (http://creativecommons.org/licenses/by/4.0/).
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.