Issue |
MATEC Web Conf.
Volume 147, 2018
The Third International Conference on Sustainable Infrastructure and Built Environment (SIBE 2017)
|
|
---|---|---|
Article Number | 06005 | |
Number of page(s) | 8 | |
Section | Construction Management | |
DOI | https://doi.org/10.1051/matecconf/201814706005 | |
Published online | 22 January 2018 |
Value engineering application for conceptual design of seawater desalination plant in Jakarta
Graduate Student, Civil Engineering Department, Faculty of Engineering, Universitas Indonesia, Kampus UI Depok, 16424, West Java, Indonesia
* Corresponding author: rianmantasasp@gmail.com, rian.mantasa@ui.ac.id
Jakarta has 10.2 million inhabitants. It has thoughtful problem about clean water availability. Today, only 54% of clean water availability could be supplied to citizens in Jakarta. The urgent need of new clean water resources is highly demanding for Jakarta future life. By employing abundant sea water in the northern part of Jakarta, desalination is a highly effective way that has been proven through value engineering. A conceptual design of desalination project is completed through FAST diagram and benchmarking method. According to life cycle cost analysis, it results IRR 13%, net product value Rp3.782 trillion, payback period of 13.39 years, and benefit cost ratio of 3.00. To make this project complete and reasonable, the public-private partnership should be conducted for modal sharing. This research piloted four analyzed scenarios. The best alternative scenario makes the government budget 60% for initial cost, spend half for operational and maintenance cost, and obtain 20% from the whole project revenue.
© The Authors, published by EDP Sciences, 2018
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited. (http://creativecommons.org/licenses/by/4.0/).
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.