Issue |
MATEC Web Conf.
Volume 147, 2018
The Third International Conference on Sustainable Infrastructure and Built Environment (SIBE 2017)
|
|
---|---|---|
Article Number | 05007 | |
Number of page(s) | 4 | |
Section | Ocean and Marine Engineering | |
DOI | https://doi.org/10.1051/matecconf/201814705007 | |
Published online | 22 January 2018 |
Structural Development for Well Service Activity in Limited Capacity Platform
Facility Engineering & Integrity (FEI), PT PHE West Madura Offshore (WMO), Jakarta 12520, Indonesia
* Corresponding author: marciela.dewa@gmail.com ; marciela.dewa@pertamina.com
The idea is to replace drilling rig, which is utilized for work over/well services activities, with working barge. The challenge comes from the operation and structural platform capacity since the majority of PHE WMO wellhead platform has limited capacity issue and braced monopod type. To minimize the risk of drilling equipment placed on the platform, engineering study is proposed to ensure the reliability of the platform. The process and method of operation during well service activity will also be developed. The proposed mitigation includes: Global Structural Check for Platform Integrity, Local Structural Check for Strengthening, Localized load for Additional Equipment, and Weather-Time-Frame Constraint. Using the proposed methods, PHE WMO can ensure the platform integrity and ensure SAFETY during well service activities.
© The Authors, published by EDP Sciences, 2018
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited. (http://creativecommons.org/licenses/by/4.0/).
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.