Diversion Canal to Decrease Flooding (Case Study : Kebon Jati-Kalibata Segment, Ciliwung River Basin)
1
Faculty of Engineering, Jenderal Achmad Yani University, Jalan Terusan Jenderal Sudirman, PO BOX 148, Cimahi, West Java, Indonesia
2
Faculty of Civil and Environmental Engineering, Institut Teknologi Bandung, Jl. Ganesha No.10 Bandung 40132, West Java, Indonesia
* Corresponding author: author@e-mail.org
The flood in Jakarta has become a national concern in Indonesia. It is a haunting disaster, with a high probability to happen when heavy rainfalls in Jakarta and/or its upstream area. Based on data that was provided by Public Work Agency of DKI Jakarta, there are 78 vulnerable points of inundation in which, most of them are located in Ciliwung river basin, commonly in the meandering segments. One of the worst flooding occurs in Pancoran, at Kebonjati to Kalibata segment in particular. The river discharge in this segment is much higher as compared to the carrying capacity. In addition, this area has a high density of population and thus, difficult to increase the *river capacity* by enlarging the river dimension. In this research, a closed diversion canal is proposed as a solution. The effectiveness of the solution is evaluated using a numerical model, HEC-RAS 4.1. The diversion canal is designed as two culverts, with 2.0 m in diameter. Nevertheless, hydraulic jump may occur at the outlet of the canal due to the relatively steep slope. Therefore, the canal outlet should be designed accordingly. A Hydraulic structure such as a stilling basin can be employed to reduce the energy. The results show that the diversion canal has a good performance in decreasing water level and flood discharge in the study area. The canal has the capacity of 17,72 m3/sec and succesfully decreases the water level by 4.71 – 5.66 m from flood level for 2 – 100 years returned period.
© The Authors, published by EDP Sciences, 2018
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited. (http://creativecommons.org/licenses/by/4.0/).
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.