Issue |
MATEC Web Conf.
Volume 139, 2017
2017 3rd International Conference on Mechanical, Electronic and Information Technology Engineering (ICMITE 2017)
|
|
---|---|---|
Article Number | 00111 | |
Number of page(s) | 5 | |
DOI | https://doi.org/10.1051/matecconf/201713900111 | |
Published online | 05 December 2017 |
Analysis and Design of the Logistics System for Rope Manufacturing Plant
1 College of Urban Rail Transit and Logistics, Beijing Union University, Beijing, China
2 Department of Electrical Engineering, National Changhua University of Education, Changhua, Taiwan
3 Department of Computer Science and Information Engineering, National Changhua University of Education, Changhua, Taiwan
* Corresponding author: sunsnow11@163.com
In order to promote logistics system for manufacturing plant, this paper proposed a new design for the logistics system of a rope manufacturing plant. Through the analysis in the aspects of workshop facility layout, material handling and inventory management, the original logistics system of the plant is optimized. According to the comparison of the simulation results between original and optimized design, the optimized model has the higher productive efficiency. This can provide the references for the other manufacturing plant in analysis and design of the logistics system to improve plant efficiency.
© The Authors, published by EDP Sciences, 2017
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited. (http://creativecommons.org/licenses/by/4.0/).
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.