Reducing the environmental impact of a gas operated cogeneration installation
Departament of Mechanical Engineering, Industrial Engineering and Transportation, 332006, University of Petrosani, Romania
* Corresponding author: dcpetrilean@yahoo.com
The paper deals with a case study for carried out in order to justify the installation of a gas cogeneration system fitted with an internal combustion engine, system used to supply electricity and heat to the users of an energy user which exceeds 1000 toe/year. 2 scenarios were therefore compared based on the energetic analysis:
-the actual scenario in which energy is supplied from the National Energetic System.
- the scenario in which a combined heat and power plant is used.
The amount of energy saved yearly, the specific fuel consumption and the environmental impact were determined by the comparative study. The diagrams representing the variation of the performance indicators according to the operation period were also created. The usefulness of the paper consists in the creation of the yearly optimum installation operation time chart.
© The Authors, published by EDP Sciences, 2017
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.