Issue |
MATEC Web Conf.
Volume 117, 2017
RSP 2017 – XXVI R-S-P Seminar 2017 Theoretical Foundation of Civil Engineering
|
|
---|---|---|
Article Number | 00084 | |
Number of page(s) | 7 | |
DOI | https://doi.org/10.1051/matecconf/201711700084 | |
Published online | 24 July 2017 |
Simulating operational control of production in lumber house building businesses
Moscow state university of civil engineering, Yaroslavskoye shosse, 26, Moscow, Russia, 129337
* Corresponding author: ananpi@yandex.ru
Substantial reserves for higher operation efficiency in wooden house building businesses exist in improvements of production control system through methods of simulation and optimization. This report presents analysis of key factors of lumber house building processes that influence approaches to production control simulation. The need to factor in interconnection and dependence of lumber and house part production processes is highly difficult for operational control of the production system in question. The optimization mathematical models that we developed will help to solve the tasks of operational scheduling at all stages of wooden house manufacturing, from log cutting to production of finished assembly sets.
© The Authors, published by EDP Sciences, 2017
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.