Issue |
MATEC Web Conf.
Volume 106, 2017
International Science Conference SPbWOSCE-2016 “SMART City”
|
|
---|---|---|
Article Number | 08009 | |
Number of page(s) | 6 | |
Section | 8 Organization and Planning of Construction Works and Municipal Facilities | |
DOI | https://doi.org/10.1051/matecconf/201710608009 | |
Published online | 23 May 2017 |
Mathematical modelling of the process of quality control of construction products
Don State Technical University, pl. Gagarina, 1, Rostov-on-Don, 344010, Russia
* Corresponding author: dgtu.kafedraos@yandex.ru
The study presents the results of years of research in the field of quality management of industrial production construction production, based on mathematical modelling techniques, process and results of implementing the developed programme of monitoring and quality control in the production process of the enterprise. The aim of this work is the presentation of scientific community of the practical results of mathematical modelling in application programs. In the course of the research addressed the description of the applied mathematical models, views, practical results of its application in the applied field to assess quality control. The authors used this mathematical model in practice. The article presents the results of applying this model. The authors developed the experimental software management and quality assessment by using mathematical modeling methods. The authors continue research in this direction to improve the diagnostic systems and quality management systems based on mathematical modeling methods prognostic and diagnostic processes.
© The Authors, published by EDP Sciences, 2017
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.