Issue |
MATEC Web Conf.
Volume 100, 2017
13th Global Congress on Manufacturing and Management (GCMM 2016)
|
|
---|---|---|
Article Number | 05061 | |
Number of page(s) | 6 | |
Section | Part 5: Management Engineering | |
DOI | https://doi.org/10.1051/matecconf/201710005061 | |
Published online | 08 March 2017 |
Protection of Reservoir Water Quality Combining with Rocky Desertification Present Situation
College of Architecture and Civil Engineering, Nanyang Institute of Technology
* Corresponding author: fbdb.happy@163.com
Middle Route Project of S-N water diversion will be completed this year, and by that moment, the dream of a “stream of clear spring sent to Jingjin” will be come true. The water source of Middle Route Project of S-N water diversion-Danjiangkou water reservoir’s more than half area is in Xichuan town’s Nanyang City. To investingate and protect the environment situation around water source, we have gone deep into many mountains, soil sampling, stone sampling and make chemical laboratory analysis after plenty of preparation work in early stage. We come up with feasible plan about Xichuan area’s rocky desertification, to plant plants with higher survival life in the barren mountain with advanced ways, which can achieve water conservancy on one hand, and on the other hand, to prevent from water and soil loss so as to protect water quality of Dan Jiangkou reservoir.
© The Authors, published by EDP Sciences, 2017
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.