Issue |
MATEC Web Conf.
Volume 100, 2017
13th Global Congress on Manufacturing and Management (GCMM 2016)
|
|
---|---|---|
Article Number | 02035 | |
Number of page(s) | 4 | |
Section | Part 2: Internet +, Big data and Flexible manufacturing | |
DOI | https://doi.org/10.1051/matecconf/201710002035 | |
Published online | 08 March 2017 |
Applying TPM on Production Line of Huanwei
1 Management Engineering School, Zhengzhou University, Zhengzhou, People’s Republic of China
2 Henan Engineering Research Center of Digital Medicine, Zhengzhou, People’s Republic of China
3 The first Affiliate Hospital, Zhengzhou University, Zhengzhou, People’s Republic of China
Corresponding Email: 1174995417@qq.com
As customers increasingly focus on the quality, cost, delivery time of the product, therefore the production line needs to improve production efficiency, improve product quality, which requires the introduction of a management system. The TPM (Total Productive maintenance) as a starting point to maintain the equipment, maintenance activities through full participation in the maintenance, increase productivity, reduce production costs.
The study based on the study and analysis of the TPM theory, based on my practice in the SMT2 production line of Victoria Electronics of Huanwei. Then it studied the promotion and implementation steps of TPM on SMT2 line. And it also introduced the improvement instance of SMT2 line. By contrasting the utilization of equipment on SMT2 line before and after the comprehensive of TPM, the necessity of implementing TPM is derived. For how to apply TPM on the production lines, and how to improve equipment comprehensive utilization, finish the order on time, provide high quality products to our customers, these are the main part of production line equipment management work. This article provides the reference for how to promote TPM on other production lines.
© The Authors, published by EDP Sciences, 2017
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.