Issue |
MATEC Web Conf.
Volume 92, 2017
Thermophysical Basis of Energy Technologies (TBET-2016)
|
|
---|---|---|
Article Number | 01029 | |
Number of page(s) | 4 | |
DOI | https://doi.org/10.1051/matecconf/20179201029 | |
Published online | 21 December 2016 |
Evaluation of scale formation in waterwall heated surfaces
1 Tomsk Polytechnic University, 634050, Tomsk, Russia
2 Omsk State Transport University, 644046, Omsk, Russia
* Corresponding author: taylasheva@tpu.ru
This paper presents the possibility of forecasting assessments of the speed and the time of formation of depositions in the evaporator-tube elements of double-drum boilers. The values of thermal flow in the wall region of tank screens of boiler furnace are obtained, besides the velocity values of scaling metal corrosion products are obtained. Conclusions about the ability of forecasting unnominal situations and emergency risks dependent with damage to the screen surface heating pipes are made.
© The Authors, published by EDP Sciences, 2017
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.