Issue |
MATEC Web Conf.
Volume 91, 2017
The Fourth International Youth Forum “Smart Grids 2016”
|
|
---|---|---|
Article Number | 01016 | |
Number of page(s) | 5 | |
DOI | https://doi.org/10.1051/matecconf/20179101016 | |
Published online | 20 December 2016 |
Human Resourcing Challenges of The Smart Grids Deployment Projects in Russia
Tomsk Polytechnic University, 634050, Tomsk, Russia
* Corresponding author: ovmtom@tpu.ru
The article addresses the issue of the causes of human resources gaps for the implementation of projects for the deployment of intelligent electricity grids. The “focus group” research technique used in Tomsk Polytechnic University enabled to identify numerous barriers encountered by present-day engineering students in Russia on the path of their professional development. The barriers explored impede greatly the creation and introduction of state-of-the-art technological systems, Smart Grid being one of them. The elimination of those barriers will accelerate the accomplishment of the Smart Grid project.
© The Authors, published by EDP Sciences, 2017
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.