Issue |
MATEC Web Conf.
Volume 81, 2016
2016 5th International Conference on Transportation and Traffic Engineering (ICTTE 2016)
|
|
---|---|---|
Article Number | 06003 | |
Number of page(s) | 5 | |
Section | Supply Chains | |
DOI | https://doi.org/10.1051/matecconf/20168106003 | |
Published online | 25 October 2016 |
Investigation of Effectiveness of Order Review and Release Models in Make to Order Supply Chain
Politecnico di Milano, Management, Economics and Industrial Engineering Department, 20133, Milano, Italy
Nowadays customisation becomes more common due to vast requirement from the customers for which industries are trying to use make-to-order (MTO) strategy. Due to high variation in the process, workload control models are extensively used for jobshop companies which usually adapt MTO strategy. Some authors tried to implement workload control models, order review and release systems, in non-repetitive manufacturing companies, where there is a dominant flow in production. Those models are better in shop floor but their performances are never been investigated in high variation situations like MTO supply chain. This paper starts with the introduction of particular issues in MTO companies and a general overview of order review and release systems widely used in the industries. Two order review and release systems, the Limited and Balanced models, particularly suitable for flow shop system are applied to MTO supply chain, where the processing times are difficult to estimate due to high variation. Simulation results show that the Balanced model performs much better than the Limited model if the processing times can be estimated preciously.
© The Authors, published by EDP Sciences, 2016
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.