Issue |
MATEC Web of Conferences
Volume 40, 2016
2015 International Conference on Mechanical Engineering and Electrical Systems (ICMES 2015)
|
|
---|---|---|
Article Number | 07003 | |
Number of page(s) | 5 | |
Section | Power electronics engineering | |
DOI | https://doi.org/10.1051/matecconf/20164007003 | |
Published online | 29 January 2016 |
Economic Analysis in Restructured Electricity Supply Industry (ESI) for Malaysian Market Model
Electrical Technology Section, Universiti Kuala Lumpur British Malaysian Institute, Malaysia
Before 1980s, the generation, transmission and distribution vertically related sectors have typically been tied together within a utility. It has been either, investor owned and state-regulated or owned by the local municipality. Each sector was thought of as a natural monopoly. During that era, there were two main reasons accelerated for restructuring needs. The first one was to widen up the choices of electricity for customers. And the second one was due to rapid expansion capacity needs in generation, transmission and distribution. In Malaysia, the Malaysian Electricity Supply Industry (MESI) has aimed to restructure its current model to become a wholesale market model. In 1992, by introducing the Independent Power Producers (IPPs) in the loop, MESI applies Single Buyer model. Single Buyer model is one of the existing models available under the restructuring apart from Pool and Bilateral. This paper evaluates the economic benefits for Malaysia with the current structure from the side of electricity provider. A case study with load variation for three different maximum demands is considered in this paper. The mathematical equation developed by zero Loss of Load Probability is applied to evaluate the economic benefits.
© Owned by the authors, published by EDP Sciences, 2016
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.